Get a Quote
Dam & Grouting

Dam & Grouting

Bore and grout dam foundations, tunnels and galleries with low- to medium-pressure cement slurry, using compact grouting rigs and matched pumps built for tight, confined sites.

Conditions

What the job requires

Every application is defined by depth, formation and the equipment matched to those numbers — the configuration below is built around those numbers.

Headline rating200 m
Core / hole sizesBQ / NQ / HQ / PQ
FormationWeathered to hard rock
Recovery target95%+ core recovery
Recommended configuration

A complete, matched package

ZJ-200

ZJ-200

Lightweight grouting drill for galleries and hydropower

View rig details

Matched tools and equipment

  • ZJ-200 main unitDepth
  • BW-160 fluid pump160 L/min
  • Drill rods & casingMatched full-depth set
  • Diamond & PDC bitsHard-rock matrix
  • Reaming shellsMatched to rods
  • Core / wireline barrelBQ–PQ assembly
  • Spare-parts packageWear and service parts
Configure and quote
Workflow

From setup to recovery

1
Site setupLevel the rig, connect the pump and power unit.
2
Open the holeCollar the hole with a guide and stabilize the top.
3
DrillingAdvance the bit, control pressure and rotation.
4
RecoveryRun the barrel, extract and log the core or sample.
5
Hole protectionCase unstable zones and keep fluid circulation.
Related cases

Results from real projects

Deep-hole core drilling at a metal mineGansu, China

Deep-hole core drilling at a metal mine

A JQ-1200 with NTW/HTW wireline tools cored a hard quartz-sandstone formation to 760 m at a 70° angle, completing three deep holes in 91 days.

760 mHole depth
≥95%Core recovery
3 holes91 days
Agricultural irrigation well groupNorth China Plain

Agricultural irrigation well group

A hydraulic exploration rig built a well group through loose Quaternary and sand layers, with wall-protection mud solving water-yield and stability needs.

260 mHole depth
100%Well success
~12 daysPer well
Geotechnical survey for rail transitUrban rail project

Geotechnical survey for rail transit

A light hydraulic rig with continuous core-barrel sampling handled many holes and frequent relocations along a long rail corridor.

120 mHole depth
35 m/dDaily footage
100%Report pass
Foundation survey and groutingBuilding project

Foundation survey and grouting

A core rig and crawler carrier worked together on pile survey and ground grouting, with the carrier handling frequent on-site moves.

80 mHole depth
On timeDelivery
CarrierSite moves
Teaching and research drillingUniversity campus

Teaching and research drilling

A light exploration rig gave geology students a clear, safe, easy-to-learn platform while meeting research sampling needs.

70 mHole depth
Full demoTeaching
CompleteTeaching core
Knowledge

Read before you specify

CallWhatsAppQuote