Get a Quote

All case studies

Deep-hole core drilling at a metal mineGansu, China

Deep-hole core drilling at a metal mine

A JQ-1200 with NTW/HTW wireline tools cored a hard quartz-sandstone formation to 760 m at a 70° angle, completing three deep holes in 91 days.

760 mHole depth
≥95%Core recovery
3 holes91 days
Agricultural irrigation well groupNorth China Plain

Agricultural irrigation well group

A hydraulic exploration rig built a well group through loose Quaternary and sand layers, with wall-protection mud solving water-yield and stability needs.

260 mHole depth
100%Well success
~12 daysPer well
Geotechnical survey for rail transitUrban rail project

Geotechnical survey for rail transit

A light hydraulic rig with continuous core-barrel sampling handled many holes and frequent relocations along a long rail corridor.

120 mHole depth
35 m/dDaily footage
100%Report pass
Foundation survey and groutingBuilding project

Foundation survey and grouting

A core rig and crawler carrier worked together on pile survey and ground grouting, with the carrier handling frequent on-site moves.

80 mHole depth
On timeDelivery
CarrierSite moves
Teaching and research drillingUniversity campus

Teaching and research drilling

A light exploration rig gave geology students a clear, safe, easy-to-learn platform while meeting research sampling needs.

70 mHole depth
Full demoTeaching
CompleteTeaching core
Who we serve

Customer types we work with

Geological survey unitsMatched rigs, tools and parts for the job
Mining companiesMatched rigs, tools and parts for the job
Water-well drilling teamsMatched rigs, tools and parts for the job
Engineering survey institutesMatched rigs, tools and parts for the job
Infrastructure contractorsMatched rigs, tools and parts for the job
CallWhatsAppQuote